JUST HOW TO INSTALL A BATH TUB (FOR NEWBIES).

Just How To Install A Bath Tub (For Newbies).

Just How To Install A Bath Tub (For Newbies).

Blog Article

Go Company

The publisher is making a number of great pointers related to How to Install a Bathtub: Install an Acrylic Tub and Tub Surround as a whole in this content which follows.


A Step-by-Step Guide to Installing a Bathtub
Setting up a bath tub isn't precisely rocket science, however it does require strong plumbing, carpentry, and also in some cases, tiling abilities. Replacing an old bath tub with a new one is likewise a moderately tough project. If the old bathtub is readily easily accessible, the project can relocate quickly; if you need to open a wall surface to eliminate the old bathtub as well as place the new bath tub, the task is much harder. In either instance, the project is within a residence handyman's skills, although you will certainly need a helper to vacate the old tub and also set in the brand-new one. Make sure you have certified yourself for the task and also are comfortable trying it. As opposed to hiring a specialist to take control of a halfway-completed project, it is better to take into consideration employing one before you start. Chances are you may require a professional plumber to make tube connections.
This write-up will assist you mount a new tub in your washroom if you have actually already purchased a brand-new bathtub and don't require to transform the arrangement of your previous water system pipelines.
Your devices and material list need to comprise the following:
  • New Tub
  • Hammer

  • Pipeline Wrenches

  • Prybar

  • Shatterproof glass

  • Level

  • Pliers

  • Adjustable Wrench

  • Putty Knife

  • Screwdriver

  • Cold Blade

  • Measuring tape

  • Pipeline Caps


  • Preparing for the Setup


    First of all, the sustaining structure provided with the bath ought to be fitted (if needed) according to the maker's guidelines. Next off, fit the taps or mixer to the bathtub. When fitting the tap block, it is essential to make certain that if the faucet features a plastic washing machine, it is fitted in between the bath and the taps. On a plastic bath, it is also practical to fit a supporting plate under the taps system to avoid stress on the bath tub.
    Fit the adaptable faucet adapters to the bottom of both faucets making use of 2 nuts and also olives (occasionally provided with the bathtub). Fit the plug-hole electrical outlet by smearing mastic filler round the sink electrical outlet opening, and afterwards pass the electrical outlet via the hole in the bath. Utilize the nut supplied by the producer to fit the plug-hole. Analyze the plug-hole outlet for an inlet on the side for the overflow pipe.
    Next, fit the end of the flexible overflow pipeline to the overflow electrical outlet. Afterwards, screw the pipeline to the overflow face which must be fitted inside the bathroom. Make certain you utilize all of the supplied washers.
    Connect the catch to the bottom of the waste electrical outlet on the bath tub by winding the string of the waste outlet with silicone mastic or PTFE tape, and screw on the trap to the electrical outlet. Link the bottom of the overflow tube in a similar manner.The bathroom need to currently prepare to be fitted in its final setting.

    Removing Old Taps


    If you need to change old faucets with new ones as a part of your installation, then the first thing you need to do is separate the water system. After doing so, turn on the faucets to drain pipes any type of water remaining in the system. The process of getting rid of the existing faucets can be rather problematic as a result of the limited gain access to that is frequently the case.
    Make use of a container wrench (crowsfoot spanner) or a tap tool to reverse the nut that links the supply pipes to the faucets. Have a fabric ready for the continuing to be water that will certainly come from the pipelines. As soon as the supply pipes have actually been eliminated, utilize the same device to loosen the nut that holds the faucets onto the bath/basin. You will certainly need to quit the single taps from transforming during this procedure. When the taps have actually been eliminated, the holes in the bath/basin will certainly need to be cleaned of any kind of old sealing compound.
    Prior to moving on to fit the brand-new taps, contrast the pipeline connections on the old faucets to the new faucets. If the old taps are longer than the brand-new taps, after that a shank adapter is required for the brand-new taps to fit.

    Installing the Tub


    Using both wooden boards under its feet, position the bathtub in the called for setting. The wood boards are valuable in evenly spreading out the weight of the bathtub over the location of the boards instead of concentrating all the weight onto four little factors.
    The next objective is to ensure that the tub is leveled all round. This can be attained by checking the level and also adjusting the feet on the tub till the spirit level checks out degree.
    To mount taps, fit the bottom of the furthest versatile faucet adapter to the appropriate supply pipe by making a compression join; then do the exact same for the various other faucet.
    Activate the water supply and check all joints as well as new pipework for leaks as well as tighten them if needed. Load the bath tub as well as additionally check the overflow outlet and the normal outlet for leakages.
    Ultimately, deal with the bathroom paneling as explained in the maker's instruction manual. Tiling and sealing around the bathtub needs to wait till the tub has actually been utilized at least when as this will certainly settle it into its final placement.

    Suitable New Touches


    If the tails of the new taps are plastic, after that you will certainly require a plastic port to prevent damage to the string. One end of the adapter fits on the plastic tail of the faucet and also the various other end supplies a connection to the existing supply pipes.
    If you need to fit a monobloc, then you will certainly call for lowering couplers, which attaches the 10mm pipeline of the monobloc to the conventional 15mm supply pipe.
    Next, position the faucet in the placing opening in the bath/basin guaranteeing that the washers remain in area in between the tap and the sink. Secure the faucet in position with the maker offered backnut. Once the faucet is firmly in position, the supply pipes can be connected to the tails of the faucets. The faucets can either be linked by using corrugated copper piping or with regular faucet ports. The former kind must be linked to the tap ends first, tightening up only by hand. The supply pipelines can later on be connected to the various other end. Tighten both ends with a spanner after both ends have actually been linked.

    Tiling Around the Bathtub


    In the location where the bath satisfies the tile, it is essential to seal the accompanies a silicone rubber caulking. This is very important as the fitting can move sufficient to break a rigid seal, creating the water to permeate the wall surface in between the bath and also the tiling, causing complications with wetness as well as feasible leaks to the ceiling listed below.
    You can select from a range of coloured sealants to assimilate your fixtures and installations. They are offered in tubes and cartridges, and also can sealing voids as much as a width of 3mm (1/8 inch). If you have a bigger space to fill, you can load it with spins of soaked paper or soft rope. Keep in mind to always load the tub with water prior to sealing, to permit the motion experienced when the tub remains in usage. The sealant can crack rather very early if you do not take into consideration this movement prior to securing.
    Additionally, ceramic coving or quadrant ceramic tiles can be used to edge the bathroom or shower tray. Plastic strips of coving, which are easy to use as well as cut to size, are also conveniently readily available on the marketplace. It is recommended to fit the tiles making use of waterproof or waterproof glue and also cement.

    A Step-by-Step Guide to Installing a Bathtub


    Is your bathtub looking a bit dated lately? Believe it or not, installing a new one is a project you can do yourself. Whether your bathtub is broken or doesn’t fit in with your current bathroom’s design, you can fix it without having to hire a contractor or paying labour costs.



    But, beyond saving money, there are other benefits of installing your own bathtub. When you do this project yourself, you can customise every step of the process. You can also make sure the finished product looks exactly the way you want it to.



    This DIY project is quite involved, but by doing some research, preparing your bathroom and using the right equipment, it is definitely one you can take on. This guide will help you understand the technical procedures behind installing a new bathtub.


    Remove the Existing Bathtub


    To remove the old bathtub, you will need to turn the water supply off before you start any work. After you turn the water off, there will likely still be some water left in your plumbing system, which you can remove by turning on a faucet below the level of the bathtub. Once the water stops running, you are ready to start working.



    The easiest way to remove the tub is to remove the faucet, handles and other piping and then pull the tub out from the wall. If this doesn’t work in your situation, you will need to remove part of the wall, remove the piping and then slide the tub out.


    Choose the Right Bathtub


    The ideal way to replace your bathtub is to find one that has the exact dimensions and has the drain and faucet on the same side as your old one. This way, it will fit in the same place and you won’t have to change the piping system in your bathroom. Choose a tub that matches your home’s decor and fits with the style of the bathroom.


    Install the Plumbing and Ledger Board


    You can purchase a tub drain kit at a hardware store which will have all the pieces you will need for your new tub’s plumbing. Follow the instructions that came with the kit to install the plumbing in the new tub and then take measurements to make sure the plumbing in the tub will align with the plumbing in your bathroom. If it doesn’t, now is the time to make necessary adjustments.



    Some bathtubs need a ledger board that is installed on the wall behind the tub to help support it. If your new bathtub requires one, the directions that came with it will tell you how high it should be installed. If your old bathtub had a ledger board, and it is still in good condition, you can adjust its height to match the new bathtub.


    Install the Bathtub


    When the plumbing and ledger board are ready, you can install the new bathtub. Carefully lower it into the space, being careful not to damage the tub, wall, plumbing or ledger board. Since bathtubs are very heavy and you will need to line the tub up exactly, it is wise to have someone help you with this step.



    Once the tub is in place, it needs to be perfectly level, so use a bubble level instead of estimating how level the tub is. Put the level on the top edge of the tub, not the bottom on the inside, since many tubs are designed with a sloped bottom.



    If the bathtub isn’t level, adjust the ledger board and shift the tub until it is. When it is level, use screws to attach the tub to the wall studs. Most bathtubs have pre-drilled holes in the upper flange, so use these but do not over tighten the screws.


    Hook up the Plumbing


    Now that the bathtub is installed, it needs to be attached to your plumbing system. First, install the shoe fitting under the tub and drain pipe, then the overflow pipe and then the drain flange. Your tub plumbing kit will include specific instructions on how to install these pieces.


    Install the Bathtub Surround


    A bathtub surround will protect the walls around the tub from water damage and can give your new bathtub a more finished look. To install one, make sure the wall is completely clean and dry so that the adhesive will be able to hold the surround securely. Then, measure the surround and mark the same dimensions on the wall above the tub.



    Following the directions that came with the surround adhesive, apply it to the wall. Press the surround against the wall on top of the adhesive and then pull it away for about three minutes to activate the adhesive, then apply the surround again. Keep in mind that this is the most common way to use an adhesive, but you should check the instructions on the package for any special steps.



    If there is any excessive adhesive around the sides of the surround, you can use mineral spirits to remove it. Then use masking tape to hold the surround panels in place until the adhesive is dry. Using silicone, seal all the cracks between the surround panels and the gap between the bottom of the panels and the top of the bathtub.



    If you want to install tile above your bathtub, instead of a bathtub surround, the process will be very similar. But, you will need to measure and cut tiles and install each one individually, using tile spacers to make sure they are evenly spaced. You will then use grout to fill in the spaces between the tiles.

    https://www.hss.com/blog/bathroom/a-step-by-step-guide-to-installing-a-bathtub/


    A Step-by-Step Guide to Installing a Bathtub

    I was made aware of that report about Tools You Need to Install a New Bathtub through someone on a different web property. Sharing is good. Helping others is fun. I cherish reading our article about How to Install a Bathtub Yourself.



    Visit My Site

    Report this page